New Model Confetti Machine

The horn connection adopts a quick-connect method, eliminating the need for screwing, making it faster and more convenient to use.   

Why Choose us?
Facebook
Twitter
LinkedIn

Discription

Installation preparation:

1.Open the packing box, count the accessories, and read the manual carefully.

2. The machine supplies a variety of shapes of ordinary scraps of paper or sequins, as well as CO2 / nitrogen.

3.Please ensure all machine parts are intact before first use.

4.Carefully check whether the cylinder is in line with national standard cylinders.

 

Installation:

1.The machine is placed in the need-to-place location, and the wheel can be fixed.

2.Fill the bottle with the required carbon CO2 or N2.

3.Connect the machine with the gas bottle via the hose, the hose on one side connects with a tank, and the other side connects with the machine.

4.Put down the bottle and keep it flat.

5.Put confetti in the machine and adjust the angle.

6.Turn on the valve of the gas bottle.

 

Please Contact Us If You Are Looking For A Reliable supplier.

询盘表单
Scroll to Top

This website uses cookies to ensure you get the best experience