Nouveau modèle de machine à confettis

The horn connection adopts a quick-connect method, eliminating the need for screwing, making it faster and more convenient to use.   

Pourquoi nous choisir ?
Facebook
Twitter
LinkedIn

Description

Installation preparation:

1.Open the packing box, count the accessories, and read the manual carefully.

2. The machine supplies a variety of shapes of ordinary scraps of paper or sequins, as well as CO2 / nitrogen.

3.Please ensure all machine parts are intact before first use.

4.Carefully check whether the cylinder is in line with national standard cylinders.

 

Installation:

1.The machine is placed in the need-to-place location, and the wheel can be fixed.

2.Fill the bottle with the required carbon CO2 or N2.

3.Connect the machine with the gas bottle via the hose, the hose on one side connects with a tank, and the other side connects with the machine.

4.Put down the bottle and keep it flat.

5.Put confetti in the machine and adjust the angle.

6.Turn on the valve of the gas bottle.

 

Veuillez nous contacter si vous êtes à la recherche d'un fournisseur fiable.

询盘表单
Défiler vers le haut

Ce site web utilise des cookies pour vous garantir une expérience optimale.